Search
Archives

You are currently browsing the archives for the Bathroom category.

Archive for the ‘Bathroom’ Category

PostHeaderIcon Shower Remodel

PostHeaderIcon Concord Bathroom Remodel

PostHeaderIcon Bathroom Remodel in Walnut Creek

Project Location: Walnut Creek
Duration: 8 days
Scope:

  • Gut bathroom down to studs
  • Replace rotted subfloor and framing
  • Tub to shower conversion, sink, vanity, mirror, light, tiling, shampoo shelf, frameless sliding glass door
  • Paint, sealant and trim finishing

Finished Bathroom

Before Renovation (below)

Categories
Links: